Project Description

Full reconstruction of industrial sites and relocation of production lines. This includes the static reinforcement of industrial buildings with the integration of metal columns, the reconstruction and installation of a 20 tone hoisting crane, the reconstruction of medium voltage substations and the dismantling / relocation of steel pipe production lines.

SPACE

Steel production industry

LOCATION

Oinofyta

DATE

03-2019

CATEGORY

INTEGRATED CONSTRUCTION SOLUTIONS